Manufacturing Services Agreement

21.15 Const parties. This agreement can be faxed and executed in one or more counterparties, each being considered original and all considered an agreement taken together. Relevant university degree, at least 5 years of experience in electronic manufacturing supplier QE, EHS QE, knowledge in the supply and infrastructure of ISO 9001, ISO 14001, OHSAS 18001, at least 5 years of experience as q. Senior Quality Engineer, specifically assigns the SolarEdge project to oversee improvement plans for the contract manufacturer, analyze, direct and deliver results to SolarEdge QA. Relevantacademic Degree, at least 5 years of experience in manufacturing in SMT, welding and assembly tree lines, knowledge in the supply and infrastructure of ISO 9001, ISO 14001, OHSAS 18001, at least 5 years of experience as qE. Certified IPC-A-610, at least 3 years of manufacturing experience in TMS lines, welding waves and assembly or equivalent experience as an inspector in production lines. QA Manager — Production level 10.3 Product configuration changes and design changes. The company can request in writing any changes to the configuration or technical modification of the product. Jabil analyzes the requirement and determines whether it can meet the requested changes within the required lead time.

If Jabil is able to meet the requested change, it will provide the Company with a notice of acceptance of the requested changes within five (5) business days after receiving the request for the requested changes, along with any additional costs and expected changes to the delivery plans, in accordance with Schedule 1. If Jabil is unable to meet or meet the changes requested by the Company within the requested delivery time, Jabil will indicate the reasons why Jabil cannot meet the requested increase within five (5) business days of receiving the company`s request. Any such changes must be recorded in writing and will only take effect with the reciprocal written agreement of both parties on the terms of this amendment, including changes in the time required for delivery, costs (including the costs of suburban or custom materials in accordance with the original construction schedule) and applicable delivery schedules. 1.22 NRE costs are the engineering, testing, fixing and tool costs set out in the work declaration for the products concerned, which are attached to Schedule 1. 4.1 Review. Jabil tests the product using test methods. The entity is solely responsible for the adequacy and adequacy of review procedures and considers that Jabil is not responsible for all the resulting claims. For each product, Jabil provides an appropriate test device, a device and combustion stations for all heating elements (the “test devices”). Jabil is solely responsible, at its own expense, for the maintenance and assurance of test equipment and the manufacture of additional devices and incineration at stations on the necessary basis and in all production or lifting facilities in which the test device is required. 1.28 “SOW” refers to the statement of work for each product, which is presented in each calendar 1 as amended in writing from time to time after agreement between the parties. The manufacturer of the contract will provide CSI (Customer Satisfactory Index) to the SolarEdge evaluation in accordance with the expectations of the services provided by the contract manufacturer.

4.4 The items to be supplied by the company. The company will provide Jabil with the company`s proprietary information and technologies and, if necessary, the loaned equipment, company-supplied components and unique components needed to provide manufacturing services. The company will also provide Jabil with all specifications, testing methods, packaging and shipping specifications, product designs, approved supplier lists, descriptions of material components (including authorized substitutions), manufacturing process requirements and all other specifications required to provide manufacturing services to Jabil.